
BAYWALK PROTECTION
BAYWALK PROTECTION — SHEET piles and a double concrete fence are being installed at the BFAR area of the baywalk in Bonuan Binloc that links to the Tondaligan Beachfront, which has repeatedly been damaged by strong waves. Construction is ongoing as of August 8, 2025. (PUNCHphoto by Butch Uka)
Share your Comments or Reactions
Powered by Facebook Comments