FLOOD CONTROL PROJECT

FLOOD CONTROL PROJECTThird District Rep. Rachel Arenas (center) consults Assistant District Engineer Marieta Mendoza on the recommended work specifications for the planned P14.8 million Marusay River Flood Control Project in Calasiao prior to her consultation dialogue with town residents. With them is Calasiao resident Ben Acosta.

 

Share your Comments or Reactions

comments

Powered by Facebook Comments